Austrian Guideline and National Report on the Use of Shotcrete
The purpose of this guideline is the standardization of quality and a uniform procedure for the production and testing of shotcrete from the technical and engineering point of view. In...

Landslide Stabilisation at the Clyde Power Project, New Zealand
The Clyde Power Project is a hydro electric development on the Clutha River in the South Island of New Zealand. A wide range of stabilization measures have been used to treat several large...

Bond Stress Test on Rock Anchor in Clayey Siltstone
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...

Testing and Evaluation of High Capacity, Multi-Strand Rock Anchors for Lake Lynn Dam
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...

Evaluation and Rehabilitation of Relief Wells
The U.S. Army Engineer District, Vicksburg has developed an expedient method of rehabilitating arrays of large numbers of gravity flowing relief wells located along the toe of dams using...

Conversion of a Concrete Slab and Buttress Dam to a Gravity Dam
The 58-foot high, 425-foot long, Ambursen-type, concrete slab and buttress, Gorge Plant Dam, which has a 120-foot long overflow spillway near the center, was converted to a concrete gravity...

Optimal Planning of Combined Sewer Rehabilitation
The need to rehabilitate many of the existing sewer systems to keep them operational is evident. The development of a rehabilitation plan that optimizes the use of funds is the first step...

Collection System Inspection and Rehabilitation Program
The Metropolitan Water Reclamation District of Greater Chicago is a regional wastewater and water resources agency responsible for serving an area of about 875 square miles. Recently the...

Hydrologic and Structural Considerations for the Initial Filling of Jiguey Dam, Dominican Republic
This paper describes the hydrologic and structural considerations of the initial filling of Jiguey Dam which is locate on the Rio Nizao about 100 kilometers west-northwest of Santo Domingo...

Urban Stormwater Runoff Control System?Village of Skokie, Illinois
Combined sewer systems in many communities lack the capacity to convey stormwater runoff from even small to moderate storm. This inadequate capacity, in turn, causes basement flooding...

Storage/Treatment Isoquants for CSO Control Planning
A quantitative procedure which identifies the technically efficient combinations of storage volume and treatment rate necessary to achieve various levels of combined sewer overflows (CSO)...

Combined Sewer Overflow Abatement Planning Based on SWMM EXTRAN Modeling
This paper discusses use of the Storm Water Management Model (SWMM), with the EXTRAN block as the hydraulic transport mechanism, as a tool for developing a facilities plan for abating...

Receiving Water Quality Bases for Evaluating CSO Control Alternatives
Waters receiving combined sewer overflow loadings in the vicinity of Bangor, Maine include the Kenduskeag Stream and the Penobscot River. The city's facilities planning effort was performed...

Application of the Storm Water Management Model in Evaluating Combined Sewer Overflows
This paper summarizes the application of the stormwater Management Model (SWW) to isolate the contributions of Combined Sewer Overflows (CSOs) to a receiving water. The CSO discharges...

Characterizing Urban Runoff Quantity and Quality
A method using simulated flows and measured pollutant concentrations was successfully applied to estimate pollutant loadings resulting from runoff during storm events from an urban area....

Storage of Combined Sewer Overflow: How Effectibe is it Anyway?
The purpose of this paper is to illustrate the importance of modeling long term rainfall records to evaluate the effectiveness of combined sewer overflow storage. This paper will present...

The Fairfield-Suisun Urban Runoff Management Program: The Approach of Small Communities to NPDES Permitting
The Fairfield-Suisun Sewer District is responsible for NPDES permit acquisition and maintenance of the storm drainage facilities of the Cities of Fairfield and Suisun City, California....

NPDES Municipal Storm Water Permit?A Utility Approach
Salt Lake City Department of Public Utilities (SLCPU) is the agency responsible for the operation of the drainage facilities in Salt Lake City. The drainage function is established as...

Continuous Simulation Modeling for Sewer Systems
The peaking-factor method of sanitary sewer design was developed to simplify the calculations in determining design flow rates. This method of analysis is conservative to the point that...

The Reliability Program in Truncated JC Method
JC method is in common use in the structure reliability analysis. In this paper, the program which can be used as to consider the truncated distribution has been proposed, With this method...

 

 

 

 

Return to search